|
|
|
|
|
|

|
Click to enlarge image |
Effect even if paper wallpaper.
Form of construction work
-I can work seven according to next order everybody, and regard as Mercury seven paints and work seven.
-Dry after remove alien substance such as dust of out side, oil etc.. back cleanly.
-in case of page is not good thin 1 ~ spreading 2 times page level make.
-plaster board, plywood, back connection connection part work seven after do sandpaper work after bone dry after stick your offer mote because use first joint tape. Lacquering works
-First coat : is right thin using spray brush, Ro
- to attach enough on out side.
-Second coat : is right to thickness within 0.3~0.5 mm by first coat and method of identification after justness page by second is dehydrated.
-I recuperate so that physical impact this herbs does not reach for at least 4~6 time after construction. Caution
-Cold day (below image 5℃) this or it is day (when it is more than humidity 85%) to rain is work discontinuance.
-that is Saeksanghwak before work and after agitate() enough use. Validity - 6MONTHS
|
|
[ 연락처 정보 ] |
Company |
(주)이레화학상사 |
Address |
경기 성남시 중원구 상대원동 190-1 sk앤테크노파크 비즈동 406,407호 (우:462-120) 한국 |
Phone |
82 - 31 - 7199655 |
Fax |
82 - 31 - 7189654 |
Homepage |
이레화학상사.kr |
Contact |
송선갑 / 대표이사 |
|
|
|
|
 |
Copyright(c) (주)이레화학상사 All Rights Reserved.
Tel : 031-719-9655 Fax : 031-718-9654 |
|
|
|
|